Crane hire cost calculator
Work out the cost of crane hire from your own rates: billable hours with a minimum order and rounding, mobilisation, return, extra costs and tax — and compare two quotes.
Result
How the cost is calculated
The calculator uses only the conditions you enter. It does not know market rates, does not price a crane by model, location or capacity, does not convert currencies and does not choose a tax rate.
- Base hours = the larger of planned hours and the minimum order
- Billable hours = base hours rounded up to the selected step (15, 30 or 60 minutes), or unchanged without rounding
- Work = billable hours × hourly rate, rounded to cents
- Subtotal = work + mobilisation + return + additional costs
- Tax = subtotal × tax % / 100, rounded to cents
- Total = subtotal + tax
Money is rounded half-up to two decimals (0.005 → 0.01): the work cost first, then the tax on the subtotal, so the total is exactly the sum of the amounts shown. The arithmetic is exact — cents, hundredths of an hour and hundredths of a percent are integers, not floating-point numbers. The minimum order applies once to the entered work; day or shift rates, overtime and several cranes are not modelled. When comparing two quotes, the difference is B − A and the percentage is relative to A; nothing is adjusted automatically, so check that both quotes cover the same work.