Combined load weight calculator

Add up a load made of several parts: items with an entered or calculated unit mass, quantities, Load / Packaging / Rigging / Other subtotals and a total — a weight breakdown you can copy or download as CSV.

Items

  1. Item 1 (untitled)

    Load · 1 × — · Entered by user

    Unit mass source
    Switching the source clears the unit mass: a calculated value is never turned into a “known” one, or the other way round.

    Item mass = unit mass × quantity

    Optional, e.g. data plate, measurement, drawing number. It is shown as you typed it and is not checked.

Weight breakdown

Download or copy the breakdown before closing the page — it is not saved.

Only the listed items are counted. This is a weight breakdown, not a check of crane capacity or the lift plan. You decide which items to include.

CSV: one “item” record per row and one “total” record with the overall mass — the total is not another item. Masses in kg, decimal point, no thousands separators. Download or copy the breakdown before closing the page — it is not saved.

How the weight breakdown is calculated

Each item has a unit mass and a quantity. The unit mass is either the value you enter (kg, metric tonnes or avoirdupois pounds, 1 lb = 0.45359237 kg) or the mass of ONE piece calculated from its dimensions and density by the same method as the load weight calculator. The quantity is applied exactly once, in the item row:

  • Item mass = unit mass × quantity
  • Group subtotal = sum of the item masses in the group
  • Total = sum of all item masses

Masses are kept in kilograms at full precision and rounded only for display, so the total can differ slightly from the sum of the rounded rows. Masses calculated from geometry are estimates: real parts have holes, welds, coatings and tolerances.

Only what you list is counted. Hook block, wire rope, lifting accessories and other loads that act on the crane are not added automatically — if they belong in your figure, add them as items in the Rigging or Other group. The breakdown does not check crane capacity, the centre of gravity, sling forces or the lift plan.

The list lives only in this open page: it is not saved and is reset when the page is reloaded. Download the CSV or copy the result to keep it.